Renovation of a 35-unit apartment building on Van Hoegaerde Street

Layout
1 column
to the right
0

A little history

To the north-west of Brussels, the Koekelberg area has developed along the Paruck, a tributary of the Senne. It was in this low-lying area, along the axis of what are now the Rue Autrique and Rue Schmitz streets, that Koekelberg Castle and its adjacent ponds once stood – the very site of the project today.

From the second half of the 18th century onwards, the presence of water and the arrival of road and rail links spurred the industrialisation of the area. The manorial hamlet gave way to the Van Hoegaerde spinning mill and then to the imposing De Boeck brewery, built in 1877, which eventually occupied the entire block. The project’s building still stands alongside the original home of the brewers’ family today.

 

A little plan

In the 1960s, the ‘Foyer Koekelbergeois’ built the Residence G. Vanderveken at No. 28. This modest apartment block, situated in a rather unusual location, was initially a standalone building, before becoming part of a larger lot comprising three blocks, which was subsequently incorporated into a P.P.A.(S) in the 1980s.

Medias
Image
Image d'archive de la brasserie de boeck
Image à droite
Top Align
middle
3 columns
1/1
Image
Image archive aérienne
Image
PPAS
Image
Situation
Text

A little modern heritage

Layout
Half
to the right
0

The original building exhibited a number of established construction qualities: its facing brickwork and architectural concrete were well preserved, while its compactness suggested relatively good structural and thermal performance. However, its location on a narrow plot confined the majority of residents to outdated layouts, with no genuinely usable outdoor spaces.

The specifications called for a two-stage renovation: 2/3 of the budget was to be allocated to renovating the flats and communal areas, with the remaining 1/3 devoted to a traditional external building envelope. We proposed the opposite strategy: limiting the interior intervention to a refresh and allocating the majority of the budget to timber extensions in order to improve a broader range of aspects of the building: social, regulatory, spatial, and cultural.

Layout
Half
to the right
0
Linked article
3 columns
Original
Image
Vue depuis la rue Vanhoegaerde
Image
Façade en CLT
Image
Photo de l'angle du bâtiment en construction
Image
Photo du bâtiment depuis la place étangs noirs
Image
Photo de l'angle du bâtiment en construction
Image
photo vers l'entrée du parking
Layout
1 column
to the right
0

An innovative and rational solution

By extending the façades as far as possible, pushing against the boundaries of the plot, and thereby ‘expanding’ the interior spaces, we were able to enhance the building’s existing qualities. This expansion allows most of the existing layouts to be retained, whilst enlarging, in turn, the living rooms, kitchens or bedrooms, depending on the specific layout under consideration. Set within these new facades, between the living spaces, are spacious loggias, providing every flat with access to an outdoor space. Finally, the redevelopment of the surrounding areas creates new opportunities for the use and enjoyment of the residential complex’s gardens.

Layout
Half
to the right
0
1 column
Original
Image
Plan étage type
3 columns
Original
Image
Photo de l'intérieur des extensions en CLT
Image
Photo de l'intérieur des extensions en CLT
Image
Photo de la jonction entre la structure en CLT et le bâtiment en béton
Image
Photo avec vue sur le palais de justice
Image
Photo de l'intérieur des extensions en CLT
Image
Photo de l'intérieur des extensions en CLT
Layout
1 column
to the right
0
2 columns
Original
Image
Coupe (AA) du projet
Image
Coupe détail du projet
Team
BESP
MK Engineering
Date de début
2020